Guangdong Chuangfeng New Energy Technology Co., Ltd. commissioned Guangdong Zhihuan Innovation Environmental Technology Co., Ltd. to conduct an environmental impact assessment for the 3,000 tons/year waste electric vehicle and waste lithium battery dismantling, crushing, and cascade utilization project.
During the first public announcement of this project, it was named the 10,000 tons/year waste electric vehicle and waste lithium battery dismantling and cascade utilization project. During the preparation of the EIA draft for comments, Guangdong Chuangfeng New Energy Technology Co., Ltd. adjusted the project's processing and comprehensive utilization scale according to market demand. The project name has now been changed to the 3,000 tons/year waste electric vehicle and waste lithium battery dismantling, crushing, and cascade utilization project.
According to the relevant provisions of the 'Measures for Public Participation in Environmental Impact Assessment' (Ministry of Ecology and Environment Order No. 4), it is necessary to publicize the environmental impact of this project (see the EIA draft for comments) so that the public can understand and solicit opinions related to the environmental impact of the construction project.
I. Project Overview
The project is located on the sixth floor of the second workshop and the second floor of the first workshop at No. 113 Shengli Road, Sanzao Town, Jinwan District, Zhuhai City. The construction content is as follows: a leased area of 2,700 square meters, including a crushing and sorting workshop (sixth floor of the second workshop) and a dismantling and cascade utilization workshop (second floor of the first workshop), constructing one lithium battery dismantling line, one lithium battery cascade utilization line, one lithium battery monomer crushing and sorting line, and one electric vehicle dismantling line; one lithium battery discharge device.
II. Network Link and Ways to Access the Full Text of the EIA Draft for Comments and the Paper Report
Any unit or individual can view the full text of the '3,000 tons/year waste electric vehicle and waste lithium battery dismantling, crushing, and cascade utilization project' EIA draft for comments through the network link, which is https://pan.baidu.com/s/1fLFrPHvhrEm_peJ6y_hHgQ?pwd=10bf, extraction code: 10bf.
Any unit or individual who needs to consult the paper report can go to No. 113 Shengli Road, Sanzao Town, Jinwan District, Zhuhai City or Room 509, No. 363 Dongfeng Middle Road, Yuexiu District, Guangzhou City, Guangdong Province.
III. Scope of the Public for Soliciting Opinions
The scope of the public for soliciting opinions is mainly the residents and groups around the project.
IV. Network Link for the Public Opinion Form
Any unit or individual who has valuable opinions or suggestions on the project EIA can fill in and feedback by downloading the public opinion form. The network link for the public opinion form is https://pan.baidu.com/s/1fLFrPHvhrEm_peJ6y_hHgQ?pwd=10bf, extraction code: 10bf.
V. Ways and Means for the Public to Submit Opinions
Any unit or individual who has valuable opinions or suggestions on the project EIA can submit the completed public opinion form to the construction unit or the EIA unit by email, letter, etc., within the time limit for submitting opinions, reflecting opinions and suggestions related to the environmental impact of the construction project.
(1) Contact information of the construction unit:
Company Name: Guangdong Chuangfeng New Energy Technology Co., Ltd.
Contact Person: Wu Shaomei
Contact Number: 0756-5207006 Email: hr01@tindacn.com
Contact Address: No. 113 Shengli Road, Sanzao Town, Jinwan District, Zhuhai City
(2) Contact information of the EIA unit:
Company Name: Guangdong Zhihuan Innovation Environmental Technology Co., Ltd.
Contact Person: Engineer Li
Contact Number: 020-83517465, Email: 41113973@qq.com
Address: Room 509, No. 363 Dongfeng Middle Road, Yuexiu District, Guangzhou City, Guangdong Province
VI. Time Limit for the Public to Submit Opinions
The time limit for the construction unit to solicit public opinions is 10 working days from the date of publication of this announcement.
Guangdong Chuangfeng New Energy Technology Co., Ltd.
March 1, 2024


